Projects


Under Construction


Baker Block Apartments, Costa Mesa.

Costa Mesa Flats


Redevelopment of a surface-parked office building as 240 apartments, walkable to restaurants, shopping and office.

Public Art


Four-story mural by street artist Shepard Fairey at the 55 Freeway in Costa Mesa.

Fullerton MXD


Redevelopment of a closed car dealership as 290 apartments with retail, walkable to Metrolink and Downtown Fullerton.  Estimated construction completion 2020.

Huntington Beach MXD


Redevelopment of a strip commercial center as 385 units over retail in the Town Center Neighborhood of a new form-based specific plan area.

LA South Bay


Replaced an industrial building in the middle of a residential neighborhood with multifamily housing designed sensitively towards adjacent townhouses and single family homes.

Pasadena MXD


Redevelopment of surface-parked strip retail with vertically mixed housing, retail and public parking in the Pasadena Playhouse District.

Pasadena TOD


Premium flats and lofts at the Lake Avenue Gold Line station in Pasadena.

LA Arts District Condo TOD


Replaced a surface parking lot with 303 condos over 2 levels underground parking at the Little Tokyo / Arts District Gold Line station.

Chula Vista Family


156 family apartments in the center of a suburban masterplan.  Santa Barbara Mission architecture.  City Beautification award winner.

Irvine Brownstone


Brownstone apartments and stoops in a suburban office area that the city sought to redevelop with pedestrian-oriented mixed-use.  Not built, due to objections from corporate neighbor.

DTLA Urban Renewal


Redevelopment of three block-sized parking lots in the LA Arts District / Little Tokyo neighborhood with 650 units of new apartments and condos.